Tuesday, 6 December 2022

Enginering Works Complete

Long post alert! The last few weeks have seen some significant activity to get the layout working again. Mostly it went well but there was one setback...

In my last post I said it was time to get on with the ballasting. I decided to use my usual Woodland Scenics but using the medium rather than fine versions. The more I looked at the pictures of the trackbed the more I realised I had been incorrectly using the fine size and the individual stones were larger than I had imagined. I mixed up some light grey and grey to give it tone and put it down. I stuck it down with watered down PVA with the obligatory liquid soap but I did have misgivings on how it looked. It was really too bright and I had made the mix 50:50 and it would probably be better at 80:20. I tried toning it down but that made it worse....

I was going to live with it until I went to Warley and I was perusing the Attwood Aggregates stand. I was taken by the way real stone has variety of colour built in. I took a couple of bags, one greyish one for this layout and another more sandy coloured one for the Ashover layout. I took up the fresh ballast and, needless to say, it went down a lot easier. I don't know if it is because it is natural and not fabricated but it didn't shift when I applied the PVA.

Here's a couple of shots of the ballast including some taken using the macro lens on the phone:

 




The other big change that I decided to do at the same time was to replace the traverser. The traverser is a great bit of kit but as others will testify, modifying a layout once complete is rarely a wise move which leads to compromises and bodges. My bodge was that the traverser was 48" long but it had to fit into a 51" space. This necessitated some bridging timbers which, combined with some rather mediocre track laying my yours truly, meant that reliability was often an issue with derailments at the joins. Theoretically there really should have been no derailments on a layout that has not points!

If you have followed the blog from the beginning then you'll know that the driver for the traverser was that my original 4 road fiddle yard was connected via 9" radius curves which my newly built coaching stock woudl not go round. I still had that fiddle yard with its dowels to connect to the back of the layout so I dismantled it and used it's front and rear faces along with new sides and top to create the fiddle yard below. 

The yard now 5 roads with the centre one straight. What I have discovered with this layout is that running tends to consist of running the same train round several times whilst talking to visitors and only changing the train occasionally. Hence, the desire to have a straight track to limit the chance of derailments. Last year I invested in a Morley controller which can be seen in the photo below. There is a carefully cut hoel under the controller to take the cabling.



I then had to relay the track on the end boards since the levels had all changed. I took the opportunity to take this very slowly and carefully to ensure good transitions at the baseboard joins. I've found I can put up the main board, fiddle yard and one end board in the room which is how I have been working the last couple of weeks. First is a photo of the underside with the wiring in place and tag strips ready for the necessary point motor wiring. I need one more MP1 point motor and they are in short supply currently. For now it works fine without them.


Here is the completed fiddle yard complete with test track. since Melin Dolryhd only needs one controller it seemed sensible to use the second controller as a test track. The track is wired up and the buffer stops are my own 3D designed and printed coupling height gauges. 


So the engineering works are complete and the layout is ready to go to Maidenhead Show the first week of January. Actually I need to redo the curtains but they will get sorted the week before the show when the layout gets erected in the lounge for a quick check.

Wednesday, 16 November 2022

Time for a refresh

When I was exhibiting Melin Dolrhyd at the Welshpool Gala this year, I was very taken with Martyn Harrison's Castle Caereinion - see the post http://going-loco.blogspot.com/2022/09/return-to-welshpool.html What I really liked was his code 40 track and how it gave a much more light railway feel to the layout. Peco crazy track is excellent for building reliable track quickly but there is no getting away from how chunky it is.

There were really two questions to solve:

  • Would my stock run over it?
  • Was it worth the effort?

To satisfy the first question I had to first obtain some track and also obtain some track gauges. I ordered some code 40 rail from the 2mm Association and some track gauges from FastTracks in the U.S. I already had some suitable sleeper material from the 3mm Society. Once I had all the parts I built a short test track on foamboard. I already had a similar test track with Peco crazy track and was able to compare the two.


Peco on the left and scratchbuilt code 40 on the right. The difference between the two is huge! The track is simply stuck down to the wooden sleepers using impact adhesive. In real life the WLLR pinned the track down. There were no chairs. I was able to run all my stock along the track and none of them bounced on the sleepers, not even the oldest engine in the fleet.

That leaves the question of whether it is worth it. I came away from the Welshpool Gala energised by the show but dissatisfied with the operation of Melin Dolrhyd. The front of the layout was fine but the traverser was not as successful as I had expected. Much of this can be put down to having to make a 4ft traverser fit in a space which is just over 4' 3" long. There were packing pieces and packing pieces and the traverser never seemed to be level across all the tracks. Derailments were more frequent than they should have been for what is essentially a straight piece of track. The traverser is an excellent piece of kit but is overkill on Melin Dolrhyd and suffers from the curse of being a modification to an original design which didn't plan for it.

Taking on board my dissatisfaction with the running I decided it was worth the effort of replacing the track on the front along with replacing the traverser on the back. I'll cover the rear of the layout in another post.

Once the decision was made, I ordered some 1m lengths of track from C&L Finescale along with some roller gauge and they arrived on Friday. I popped across to the 3mm Society West Byfleet meeting on Saturday to pick up some deeper sleeper material which meant I had all the materials necessary to start, so start I did.



The ballast had been stuck down with the usual pva mix and the track itself was originally stuck down with impact adhesive. I used a dropper to wet the track and then worked away at the ballast with the screwdriver I use for almost every task where I don't use a scalpel. The track itself lifted relatively easily. The track bed is foamboard so I was worried that the card cover would soak and tear off, but it has stayed so far.


In fact it all came off quite easily with the exception of one of the baseboard joins where the card did tear off. In the next post I'll cover preparing it all and laying the track.




Monday, 2 November 2020

Photographing models

Recently I have found that I have struggled to take good photos of models. I would balance track on different boxes or mounting board but it was never a good experience. I can always use Melin Dolrhyd but the lighting isn't as far forward as it really needs to be for good photographs. I had a piece of track that originally was a DCC programming track set on something that could be fashioned into an embankment but it had no depth so something had to be done.

I found an offcut of MDF and started cutting out foamboard. I had an idea of a curve of track, set on an incline with a platform that could be used to host non track based products. The first picture shows the basic shape. A piece of wood is holding the stone walling join against the platform edge.


After that it was a case of laying track, putting some sandpaper down to represent the platform surface. Rummaging through the bits and pieces box I found some fencing from my first 009 layout and then I found a nameboard from the layout. I had to pause then as most work is done early morning and late night and I realised that static grass cannot be done in artificial light. It needs some natural, if grey, light to help with the colour blending. The second progress shows the progress after doing the grass.


After that it was onto the homeward stretch for a little bit of weathering and a hedge across the back to help with hiding the back. I also have a piece of backscene on a some floating mounting board that can go behind. The final picture is the finished product with Triumph on display with its nameplates that arrived from Narrow Planet recently.


All in all just a few hours work and now I have something readily available for photography.

Sunday, 21 February 2010

Test Track on Chertonwell

Yesterday was Risex 2010 and we were exhibiting Chertonwell. It's a nice show with good mix of layouts, traders and demonstrations. Phil Parker popped in and commented on the test track we have on Chertonwell so I thought I would say how we did it. He has beaten me to an actual blog on the subject here.

On Chertonwell we run a lot of trains. Normally there will be 10 at any one time. Over a day that amounts to some 70 train hours of continuous running. As a result they can get dirty and need a good clean.

We decided that somewhere to clean engines would be good. What I did was take a piece of chipboard which was cut in two and had the corners cut off. I edged it so that items couldn't roll off - didn't stop us losing a spring yesteday which escaped whilst dismantling a loco. The board is hinged down the middle, In the picture you can see the timber in the centre of the board with hinges on top so it folds flat.

I glued settrack to it so I didn't have to fight the springing of flexitrack and the wires go to two banana sockets. Just over on the right you can see the flexible wiring to allow the board to close. The board bolts to the layout when in use by the coach bolt whose wing nut can be seen at the rear. The layout has a separate controller built in, the controls being to the left of the photo.

We literally bolt in on and plug in two banana connectors and it's ready to go. The only addition since first use is a resisitor that allow the current flow to the loco to be measured. Very useful for seeing whether any current is actually flowing.

It's a really useful feature of the layout and we would be lost without it.