Snow day! The Beast from the East II meant I gave myself a day off from chores or driving anywhere and focused on building the mill. I'd recently filled in the scenic area with polystyrene - more use of Celutex having been abandoned due to having fibreglass in it which isn't good for anyone, especially the cat. Now it was time to tackle the mill.
There are many problems about the mill, not least not having any decent plans or pictures. I've trawled all my books, the internet, friends archives and the majority of pictures are of the mill in later life. The best picture was from a Railway magazine but even that shows the mill in a fairly abandoned state.
What I have discovered is that it is essentially L shaped with two extensions, one of which goes over the mill race and houses the mill wheel. It's embedded into the hillside and the judging by the windows and doors, the read portion (which must be the living accommodation) must be higher inside than the working portion at the front. Overall it appears to have 4 different roof angles and is a mixture of stonework, timber cladding, rendering and timber framed. Oh and did I mention no plans or drawings. I know I could go up to Welshpool and do a site visit and ask to measure the actual building but I'm not that sort of modeller.
It was going to be trial and error so I started with a cereal packet mock up but that was just not right, I'd clearly got the elevations wrong. Still, it gave me the direction to move in with shallower roofs and reduced depth. I found a picture of the mill with a train going by so that helped to estimate the height. I then progressed to the second mock up but this time out of mounting board.
I started with the base and just built up the sides. After I had done the first left corner I realised it was still too small so I raised it all by 10mm just by putting a second, larger, piece on the existing wall. There's nothing to say what is right or wrong so I just progressed round the building adding extension pieces and walls as I thought it looked right.
I still have the extensions over the mill race and to the right of the building to do but they should come quite quickly now that the basic shell is there. What will happen next is that this will move from mock-up to the actual building by just being clad in different Wills sheets. I'm coming to the conclusion that the rendering was potentially a later addition so I will mainly use the same stone as I used for the mill race walls along with timber cladding. There is just a small amount of timber framing on the front face, most of it is on the right hand side.
Subscribe to:
Post Comments (Atom)
Leek & Manifold Transport Wagons
Personal modelling has taken a big hit recently with launching a new shop for STModels along with taking the trade stand to Narrow Gauge Sou...
-
Ever since attending last year's Welshpool Gala and spending an inordinate amount staring at it in the loop, I have been wondering how t...
-
The last exhibition showed the need for a good 3rd engine. I had the Chivers Finelines RC17 Welshpool & Llanfair Joan kit sat in a box, ...
-
Personal modelling has taken a big hit recently with launching a new shop for STModels along with taking the trade stand to Narrow Gauge Sou...
No comments:
Post a Comment