Monday, 20 May 2019

First Outing

Last week the layout had its first outing at the Loddon Vale MRC 50th Anniversary Exhibition in Swallowfield, close to Reading. I had attended this show before as an operator for Matt Kean and he came and helped me this time. With it being just 10 minutes from home it made it an ideal location to try the layout - close enough to dash home if anything was needed (it wasn't).


We were put in a corner which was fine and had plenty of space to work with. It was less than 30 minutes to put the layout up and with experience we could probably get it down to a lot less. The inbuilt lighting proved it's worth as the day started fair but got dark and wet at one point and the lighting in this corner was not that strong.


The layout attracted some lovely comments which was very gratifying. The water was commented on as the light catches it as you move your head which does create a good effect. In the picture above Joan, painted plain black, is hauling some WLLR Goods stock.


I took a few photos but would have been better either with a flash or tripod as many came out more blurred than I find acceptable. Above is one of Matt's rakes - North Wales Narrow Gauge Railway 0-6-4T ‘Gowrie’ single Fairlie hauling a mixed train of Festiniog and NWNG carriages.


The embankment provides a good viewing point for stock. This is the same train but from a more realistic low level view.


WLLR 'The Earl' with the goods. Matt had fixed the nameplates that morning so it is steadily looking more and more like it did in Cambrian days.


A close up of 'The Earl' is not too shabby and really shows off the lining that Matt did.

Overall the layout performed well. The obvious niggles were:

  • The legs didn't all touch the floor. At home it sits on a shelf and sometimes on the carpet which hid the fact. Coffee stirrers were used at the show but adjustable end pieces would definitely be of benefit.
  • The rail joins had not been soldered down and whilst they could be aligned it was clear they needed a more permanent fixing and this has already been done, soldering the ends of the rails to copper pins.
  • One of the fiddle yard tracks was out of alignment and a rail had come out of the plastic fishplate. I had soldered the frog wire to close to the end which had caused a poor fit. This has already been rectified.
There's still plenty of detailing to do but for a first outing it was a very successful event.

No comments:

Post a Comment

Leek & Manifold Transport Wagons

Personal modelling has taken a big hit recently with launching a new shop for STModels along with taking the trade stand to Narrow Gauge Sou...